Owner: |
Eastern Irrigation District |
Location: |
Brooks, Alberta |
Completion Date: |
June 2011
|
Construction Cost: |
$900,000 (to date) |
MPE's Role: |
Prime Consultant |
Description:
Work involved the preliminary design, final design, programming and electrical and controls for various structures throughout the EID. To date, fifteen sites have been automated and integrated into the EID SCADA system. This program is ongoing with the addition of two to three sites every year. Sites that were automated as early as 1994 are still in use and our programming has adapted current hardware to accommodate this older equipment.
|
Owner’s Representative:
Eastern Irrigation District
Phone: (403) 362-1400
Contractor’s Representative:
Various Contractors
Services Provided:
Feasibility and economic analysis, pre design, final design, control system programming, SCADA implementation, contract preparation and administration.
|